Skip to content
CELS Virtual Helpdesk

CELS Virtual Helpdesk

  • Systems Group
  • Blog
  • Documentation

CELS Virtual Helpdesk

CELS Shared Services Systems Group

Documentation Search

Search for:

Most Recent Dispatch

  • Coming This Summer: A New Way to Get IT Help at CELS

Site search

Electrical issue in the machine room – partial downtime.

March 29, 2022 by Stacey, Craig

Early this afternoon, the fire department was called by the folks in the basement level who reported an electrical burning smell. Around the same time, one of the power panels in the machine room (one that powers half of Jazz) went down. After som...

Early this afternoon, the fire department was called by the folks in the basement level who reported an electrical burning smell.  Around the same time, one of the power panels in the machine room (one that powers half of Jazz) went down.After some investigating, they discovered two issues.  The first was that water was leaking into the building.  The second was that is was leaking into a power distribution panel.  While both are serious issues, the latter is the one that’s really hosed us.I’m not going to explain the entire power layout, but here’s a summary so you can understand the scope of the outage.  Power Panel 1 (the panel that went down) is irrevocably tied to Power Panels 2 through 4 — this means that all four have to be down whenever there’s work being done on them.  As you may be able to surmise, they’re kind of working on the water-soaked panel.  On top of that, because it’s now a wet area, it will be some time before we can get any power back to them.  Specifically, at least 24 hours.So, Power Panels 1 through 4 will be down until *at least* tomorrow afternoon.  At or prior to that time, I’ll send another announcement on the status of things.  The total outage should not last beyond Wednesday afternoon, but could be shorter (or intermittent).This affects Jazz, the Breadboard cluster and full disclosure (SC5832), the NMPDR Mac cluster, two racks of TeraGrid, a blower fan for BG/L, the rack that houses cvs.globus.org and the DSL development machines, and the tape backup server.  We’re going to try to get what we can online through any unused power (of the right type for the equipment), but the machine room is pretty much at capacity in terms of power usage, so there’s no guarantee at this point.Updates will come as we have information for you.

Post navigation

Previous Post:

Dispatch 2008.2: Musings on Progress

Next Post:

Update on electrical issue.

Leave a Reply

You must be logged in to post a comment.

Helpful links

  • Service Catalog
  • Request…
    • a domain name
    • a GCE Unix Group
    • an IP Address
    • a Laptop Build
    • a loaner laptop
    • a JIRA project
    • a Mailing List
    • an Overleaf account
    • a port activation
    • a poster print
    • a reactivation for a returning user
    • a WordPress migration
    • a WordPress site
    • an xgitlab or gitlab migration
    • a Zoom license upgrade

Previous Dispatches

Search Documentation

Search for:

Privay & Security Notice

Privacy & Security Notice

Site tools

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
© 2026 CELS Virtual Helpdesk | WordPress Theme by Superbthemes